This project consisted of installing approximately 9,545 LF of new 36-inch gravity-flow sanitary sewer HOBAS pipe to replace an existing 36-inch gravity-flow sanitary sewer in the Jesters Creek corridor. The majority of the work was completed in the same location and alignment as the existing sewer using a combination of standard excavation and trenchless techniques, with a designated section planned for cured-in-place pipe lining pending field conditions. Multiple reconnections of smaller existing sewer lines were required throughout the project to maintain system continuity.
Replacement of 9,545 LF of 36″ gravity sanitary sewer using HOBAS pipe, trenchless methods, and CIPP lining.