$29,318,000

Contract Value

Scope

Upgrades to the existing Adamsville Repump Station provide critical system redundancy through the addition of a single 20 MGD pump. The project includes expansion of the existing building to house the new pump, along with expansion of discharge piping to accommodate increased capacity. Complete electrical systems, instrumentation, controls, and backup power generators support reliable pump operation.

This design-build project provides all design and construction services, materials, and equipment necessary for the pump station expansion. The design-builder is responsible for conducting all necessary site investigations to assess existing conditions, developing final design solutions, procuring equipment, executing construction, and commissioning upgraded pump station systems. The design-build approach provides integrated project delivery with a single point of responsibility for both design and construction, ensuring efficient coordination and optimized solutions for enhanced pump station reliability and performance.

Any questions?
Contact Us